1. Preparatorywork before the die casting machine installed on the mold: Adjust the positionof wall plate ejector according to the size of the rear roof, ensuring that theejector pin parallels( If not, the ejector will be broken and scuffed), andkeep the working surface clean.
2. Moldmust be compressed after installation, to avoid loosening in the production andresulting in drawing die.
3.Connect the cooling water and turn it on before production. All active partsshould be filled with oil to keep the parts lubricated; The ejector pin shouldbe of medium length to ensure that the product can be successfully removed. Thelength can’t be too long, or the ejector will be scuffed and broken because ofoverload. Check the plunger, making sure it’s not too long.
-
11 years of rapid development and steady progress
OUR BRAND
-
Ingenuity and ingenuity, Seiko quality
OUR PHILOSOPHY
-
Strict quality control throughout manufacture, strong technique force, advanced equipment, strict management system and perfect service to ensure mould's perfect
OUR CUSTOMIZATION
-
Careful service, perfect after-sales
OUR SERVICE
ABOUT US
Ningbo Golden Mould Co., Ltd,formerly named Ninghai Golden Mould Facoty is an enterprise of die casting moulds / plastic moulds and products manufacture, Such as radiators moulds, automobile parts moulds ,plastic toys moulds, switch moulds of intelligent home control system,hardware tool moulds and lock moulds etc ... exported to Russia,France ,Ukraine ,Iran,Algeria etc .....
-
- 12+
- Data machine
-
- 11+
- Professional production Die casting Radiator Mould
-
- 15+
- Product type

PRODUCTS
OUR SERVICE
Die-castTechnology and Maintenance of Heating Radiator











